下载海南飞鱼游戏 > Solution > Reference Project > Oil & Gas and Mining >

KUSH Project

下载海南飞鱼游戏 www.j3m0.cn Client:

Location: North of Khartoum , Sudan

Project Scale: 2860 m2 in area over roof

Period: 2015/01-2015/03

Project Name: KUSH Project

Project Description

Ark provides modular building solutions for a wide variety of industries. We serve as your general contractor, offering an alternative to traditional construction methods and providing complete support on each project.

Kush project was another turn-key case to Ark for a mining giant company from Russia.


Kush camp consists of a whole prefab building made up of 10 sub-blocks, including Office Block, VIP Block, 2-people Block, Kitchen & Mess Block, and six 4-people Blocks, all of which had been linked together with corridor units.

Among them, there were 2 VIP rooms (exclusive sanitary rooms with water heater) and 16 x 2-people rooms both of which were accommodated with TV sets, 60 x 4-people rooms, 8 x lockers rooms, 4 x storage rooms, 4 x laundry rooms with 16 washing machines, 5 x toilets rooms and 5 x showers rooms. All sleeper rooms had been accommodated with King Beds (for VIP and 2-people rooms) and Bunk beds (for 4-people rooms), writing desks and chairs, and AC sets.


In the Office Block, there are Boss Office, Conference rooms, Managers Offices and Public Offices. Each of the office room had been furnished with office desks and chairs, and filing cabinets. The communication control room, including the fire alarm control unit, was also stationed within this building.


In the Kitchen & Mess Block, kitchen equipments including the refrigerators, kitchen fan, and electrical ovens had been properly layout and connected to power; so were the dining table and chairs.


There was one secondary level general power panel for each two sleepers block, with Office and Kitchen & Mess blocks their own ones. In addition, there was one 300L water heater supplied in each showers room.


As a whole building with long straight corridors, Kush camp is resistant to the extremely hot weather and dusty environment on site.


The client was satisfied with the camp building’s finishing work, for which they were eager to move in. Due to the flexible function of Ark modular cabins, the client also wants to change the lockers’ rooms into sleepers rooms to increase the volume of accommodated persons.



------分隔线----------------------------
  • 增城区荔城街举办融合社区建设成果展 2018-12-11
  • 壮观!“千人雪地太极”刷爆朋友圈 2018-12-11
  • 好事要支持,解决劳动力更是好事 2018-11-17
  • (两会受权发布)中华人民共和国副主席简历 2018-09-24
  • 三晋史话:曹操是如何统一山西的? 2018-09-20
  • 钱增德:如何从业务精英一步步成为红色通缉犯? 2018-09-20
  • 南昌市生殖医院心理门诊正式开诊 2018-09-13
  • 【政在回应】2017年10月地方领导留言板回复盘点·甘肃篇 2018-09-13
  • 陈理、郭如才谈《习近平关于全面从严治党论述摘编》 2018-09-12
  • 曹建明:推进平安中国建设,确保国家长治久安、人民安居乐业 2018-09-12
  • 这样的特朗普是我们喜欢的。感觉烦恼失望的人,只是因为他们觉得似乎失去了“领袖”,而影响到那个国家的“领袖地位”而已,如此而已。 2018-08-26
  • 首届“芯火杯”智能硬件创新创业大赛在京启动 2018-08-22
  • 张德江:着力深化和拓展代表工作,充分发挥代表作用 2018-08-21
  • 食物能够为人体提供能量,衣服能够为人体保存能量,从而保证人的生命的延续和存在,达到健康长寿的终极目的。 2018-08-21
  • 这个四大国“针对中国”的机制,遭到了暴击.... 2018-08-16
  • 909| 199| 542| 439| 49| 484| 560| 966| 468| 934|