Location: Parassaya, Ballela, Sudan

Project Scale: 3840 m2 in area over roof

Period: 2013/04-2013/12

Project Name: EPCC FOR FACILTIES PACKAGE (FSF –STORAGE TANK-OBC & ACCESS ROADS)

Project Description

OBC is part of the EPCC for Facilities Package for Star Oil Storage Tank project in the southern Sudan area, generally contracted by RAM Energy and subcontracted by Ark on the installations and commissioning of all the prefab buildings and associated services. Star Oil wanted to build an OBC camp near her oil tank in Parassaya, aiming to provide full camping services for her staff on site permanently.

With all foundations ready for the buildings, and all prefab buildings with accessories packed inside arrived on site, Ark team started the erections since April 2013. Besides the local issues causing sometimes delay, the installations team also needed to struggle with the harsh heating weather there. All buildings’ erections and connections had been finished within one month, after which each and every associated services and system were commenced. Till December 2013, all associated systems, interior finishing and commissioning have been handed over to the client.
 

OBC is consisted of Single Accommodation Block, Double Accommodation Block, VIP Accommodation Block, Administration Block, MOSQUE Building, Sanitary Building, Kitchen & Mess Building, Recreation Block, Laundry Units, Clinic Building and Guard House etc., 14 blocks, 256 Ark flatpack units in total. Besides, Ark had also provided the pre-engineered steel structures, including Substation Building, High Voltage Tower, Workshop Shelter, Warehouse Shelter, Parking Shelter and Guard Towers.

Each building is incorporated with pitch roofing system, secondary level general power panel, MATV, PAGA, Telephone System, Structural Cabling System and Fire Alarm System. All buildings’ secondary level power panels were connected to OBC’s substation, high voltage power supplied from the municipal lines. And all the five low current systems were controlled in a control room in Administration Building, with proper man-hole cabling from building to building.

For all accommodation buildings, furniture such as beds, desks, chairs, TV sets and writing lamps had been furnished as per the plans; in addition, there were sanitary fixtures including water heaters applied for each room. For the Administration building, conference tables, writing desks, office cabinets etc. were furnished in accordance with offices’ layout. For the Kitchen & Mess Building, a whole set of Kitchen equipments and dining accessories were input. GYM equipments and clinic equipments had also been applied for relevant buildings.
 

The client told Ark’s project manager on site that OBC would be the most luxurious camp for a petroleum site like in Parassaya.

------分隔线----------------------------
  • 一直在提速降费 为何手机用户话费不降反升 2019-04-24
  • 汕尾,一座不想离开的城文章中国国家地理网 2019-04-21
  • 母亲节丨童言无忌 幼儿园的“10后”们想对妈妈说.... 2019-04-20
  • 【新媒体矩阵】长城二十四小时客户端 2019-04-15
  • 歪歪楼视频来了 重庆百米高楼歪而不倒 2019-04-15
  • 多余的解释,看看设计书。 2019-04-14
  • 《朝圣之路》第三季直面邪教争议性问题 2019-04-14
  • 火车票售票窗口首进高校 2019-04-13
  • 糖尿病打胰岛素是好还是坏?知道答案的糖友都沉默了 2019-04-13
  • 饮水思源感党恩 争做新时代好群众 2019-04-07
  • 全国青少年儿童“小金鱼”漫画大展6月10日启动 2019-02-24
  • 玩转国学:古人消寒也靠手 试试你的运气 2019-02-14
  • “中国网事·感动2018”一季度网络人物群像扫描:平民中的英雄 2019-02-14
  • 广西工商局多年坚持开展升国旗奏国歌仪式 2019-01-26
  • 生产资料公有制不会也不可能涉及生产资料的分配,这完全是你杜撰的,是强词夺理的。从这点看,你的所谓逻辑是幼稚可笑的。哈哈哈哈! 2019-01-23
  • 403| 754| 86| 210| 591| 571| 625| 722| 9| 486|