OBC ( Operations Base Camp ) Project

下载海南飞鱼游戏 www.j3m0.cn Client:

Location: Parassaya, Ballela, Sudan

Project Scale: 3840 m2 in area over roof

Period: 2013/04-2013/12

Project Name: EPCC FOR FACILTIES PACKAGE (FSF –STORAGE TANK-OBC & ACCESS ROADS)

Project Description

OBC is part of the EPCC for Facilities Package for Star Oil Storage Tank project in the southern Sudan area, generally contracted by RAM Energy and subcontracted by Ark on the installations and commissioning of all the prefab buildings and associated services. Star Oil wanted to build an OBC camp near her oil tank in Parassaya, aiming to provide full camping services for her staff on site permanently.

With all foundations ready for the buildings, and all prefab buildings with accessories packed inside arrived on site, Ark team started the erections since April 2013. Besides the local issues causing sometimes delay, the installations team also needed to struggle with the harsh heating weather there. All buildings’ erections and connections had been finished within one month, after which each and every associated services and system were commenced. Till December 2013, all associated systems, interior finishing and commissioning have been handed over to the client.
 

OBC is consisted of Single Accommodation Block, Double Accommodation Block, VIP Accommodation Block, Administration Block, MOSQUE Building, Sanitary Building, Kitchen & Mess Building, Recreation Block, Laundry Units, Clinic Building and Guard House etc., 14 blocks, 256 Ark flatpack units in total. Besides, Ark had also provided the pre-engineered steel structures, including Substation Building, High Voltage Tower, Workshop Shelter, Warehouse Shelter, Parking Shelter and Guard Towers.

Each building is incorporated with pitch roofing system, secondary level general power panel, MATV, PAGA, Telephone System, Structural Cabling System and Fire Alarm System. All buildings’ secondary level power panels were connected to OBC’s substation, high voltage power supplied from the municipal lines. And all the five low current systems were controlled in a control room in Administration Building, with proper man-hole cabling from building to building.

For all accommodation buildings, furniture such as beds, desks, chairs, TV sets and writing lamps had been furnished as per the plans; in addition, there were sanitary fixtures including water heaters applied for each room. For the Administration building, conference tables, writing desks, office cabinets etc. were furnished in accordance with offices’ layout. For the Kitchen & Mess Building, a whole set of Kitchen equipments and dining accessories were input. GYM equipments and clinic equipments had also been applied for relevant buildings.
 

The client told Ark’s project manager on site that OBC would be the most luxurious camp for a petroleum site like in Parassaya.

------分隔线----------------------------
  • 增城区荔城街举办融合社区建设成果展 2018-12-11
  • 壮观!“千人雪地太极”刷爆朋友圈 2018-12-11
  • 好事要支持,解决劳动力更是好事 2018-11-17
  • (两会受权发布)中华人民共和国副主席简历 2018-09-24
  • 三晋史话:曹操是如何统一山西的? 2018-09-20
  • 钱增德:如何从业务精英一步步成为红色通缉犯? 2018-09-20
  • 南昌市生殖医院心理门诊正式开诊 2018-09-13
  • 【政在回应】2017年10月地方领导留言板回复盘点·甘肃篇 2018-09-13
  • 陈理、郭如才谈《习近平关于全面从严治党论述摘编》 2018-09-12
  • 曹建明:推进平安中国建设,确保国家长治久安、人民安居乐业 2018-09-12
  • 这样的特朗普是我们喜欢的。感觉烦恼失望的人,只是因为他们觉得似乎失去了“领袖”,而影响到那个国家的“领袖地位”而已,如此而已。 2018-08-26
  • 首届“芯火杯”智能硬件创新创业大赛在京启动 2018-08-22
  • 张德江:着力深化和拓展代表工作,充分发挥代表作用 2018-08-21
  • 食物能够为人体提供能量,衣服能够为人体保存能量,从而保证人的生命的延续和存在,达到健康长寿的终极目的。 2018-08-21
  • 这个四大国“针对中国”的机制,遭到了暴击.... 2018-08-16
  • 356| 238| 847| 38| 498| 116| 501| 596| 603| 254|