Project in Papua New Guinea

下载海南飞鱼游戏 www.j3m0.cn Client:

Location: Komo, PNG

Project Scale:

Period: 11/2010-11/2011

Project Name: PNG LNG PROJECT

Project Description

The PNG LNG Project is a 6.6 million tonne per annum (MTPA) integrated LNG project operated by Esso Highlands Limited, a subsidiary of Exxon Mobil Corporation. The gas will be sourced from the Hides, Angore and Juha gas fleidS and from associated gas in the Kutubu, Agogo, Moran and Gobe Main oil field.

 


 

The PNG LNG project which commenced early works operations back in 2010 is now in full swing with Ark Prefab being at the forefront of this unprecedented 15 billion USD project with partner OCS International. Ark Prefab's initial Involvement In the PNG LNG project relates to the design, supply and construct of both the pioneer and main camps for the EPC5B contract for the Komo Airfield. Commissioned by partner OCS International in Nov 2011 to client MCJV (Macdows & CCC) on behalf of Esso Highlands (Exxon Mobil) the main Komo Airfield camp, comprising of several multi-story accommodation blocks can facilitate over 1000 men and is over 15,000 sqm under roof. The accommodation blocks in the main camp include senior management, junior management and workers style accommodation. In addition, a kitchen/mess facility, medical facility, site   Office, machinery zone warehouse, gymnasium, laundry facility and numerous recreation facilities have been   provided amongst other structures.

 


 

Commencement of the main camp's construction works started In April 2010 however due to several logistical delays with Inland transporting hundreds of containers through the rugged highlands of PNG without a secure road network and ensuring peace and harmony with the local located in one of the most severe torrential rain regions on the globe certainly hampered a continuous flow on with the construction e efforts. Not without its challenges the project which is now deemed a success by all Involved provided Ark the opportunity to work with partner OCS international on several innovative product developments utilising the flat pack product to create large clear span spaces which were required in both the site office and mess facility along   With a unique internal Stair design for the accommodation blocks and the site office. The construction of the pioneer and main camps was undertaken by both ARK Prefab constructors, Australian expats supplied by partner OCS International and a selection of the local indigenous PNG people In the Komo region. The project provided Invaluable experience to Ark Prefab engineers, electricians, plumbers and general contractors and also demonstrates our capability to provide large scale full turn key solutions to our clients In difficult regions.

 


 

There are two camps constructed, Pioneer Camp and Main Camp with about 700 ARK units built:
1. Pioneer Camp about 100 Ark units;
2. Main Camp about 600 Ark units.

 

Pioneer Camp

As it was still in the beginning period, it was not so easy to extend the grounds in the Pioneer that most of the Ark buildings were done in one level. and the units were stacked onto the concrete foundations row to row. There are:
- 10 Senior Accommodation Units;
- 40 Junior Accommodation Units;
- 12 Mess/Kitchen Units;
- 20 0ffice Accommodation Units;
- 2 Laundry Units;
- 1 Guard House;
- 2 Medical Facilities Units;
- 2 Ablution Blocks;
- 3 Storage Units and others.

 

Main Camp

As it was progressed, most of the builders on site were getting more and more familiar with what they are doing, and the Ark accommodations buildings were built to what they should be like. Most of the Ark buildings are Double-Level blocks with stairways and over-roofs on top.
There are:
- 2 Double-Level Senior Blocks(24-Unit Block);
- 3 00uble-Level Junior Blocks(20-Unit Block);
- 1 Management Laundry Block(4 units combined);
- 1 Management Recreation Block(18 units combined);
- 1 Mess/Kitchen Higher Block(42 units combinec0;
- 1 Laboratory Block(4 units combined);
- 1 Medical Facilities Block(9 units combined);
- 5 Double-Level Workers Blocks(32-Unit Block);
- 1 Workers Laundry Block(6 units combined);
- 1 Workers Recreation Block04 units combined);
- 1 Workers Recreation & Camp Shopper Block06 units combined);
- 1 Workers Mess/Kitchen(42-Unit Block);
- 1 0fficers Block(84-Unit Block with over-roofs);
and there are some more Senior Villa Units built onto the row-to-row concrete foundations.

In addition, some other single ARK units are put somewhere else in the Airfield Zones for emergency or office usages, owing to the flexibility of these modular buildings.


 

"The Ark products are really good for camp solutions: they are easy to build, flexible in combination and what's most attractive is that they are modular in the structures; like in this camp, we've built two stories, one stories, most of them are with overroof and internal stairways, which is really convenient."

—— Cassius Ruka, Construction Supervisor, MCJV


 


------分隔线----------------------------
  • 增城区荔城街举办融合社区建设成果展 2018-12-11
  • 壮观!“千人雪地太极”刷爆朋友圈 2018-12-11
  • 好事要支持,解决劳动力更是好事 2018-11-17
  • (两会受权发布)中华人民共和国副主席简历 2018-09-24
  • 三晋史话:曹操是如何统一山西的? 2018-09-20
  • 钱增德:如何从业务精英一步步成为红色通缉犯? 2018-09-20
  • 南昌市生殖医院心理门诊正式开诊 2018-09-13
  • 【政在回应】2017年10月地方领导留言板回复盘点·甘肃篇 2018-09-13
  • 陈理、郭如才谈《习近平关于全面从严治党论述摘编》 2018-09-12
  • 曹建明:推进平安中国建设,确保国家长治久安、人民安居乐业 2018-09-12
  • 这样的特朗普是我们喜欢的。感觉烦恼失望的人,只是因为他们觉得似乎失去了“领袖”,而影响到那个国家的“领袖地位”而已,如此而已。 2018-08-26
  • 首届“芯火杯”智能硬件创新创业大赛在京启动 2018-08-22
  • 张德江:着力深化和拓展代表工作,充分发挥代表作用 2018-08-21
  • 食物能够为人体提供能量,衣服能够为人体保存能量,从而保证人的生命的延续和存在,达到健康长寿的终极目的。 2018-08-21
  • 这个四大国“针对中国”的机制,遭到了暴击.... 2018-08-16
  • 45| 564| 386| 220| 430| 761| 529| 202| 916| 655|